Case Studies

DSCF8156

Asbestos Removal and Demolition

Dorton Group are currently carrying out the asbestos removal, demolition, excavation and remedial works, which include for temporary works and the installation of ground anchors at the former Circus Street Markets and University Building, Brighton.

DSCF7357

Making Safe a Dangerous Structure

In February 2015 Dorton were called to attend a ‘dangerous structure’ by the Brighton & Hove City Council Building Control Department.

P2120016

Strip Out Works

In April 2015 Dorton commenced the £200K 10 week strip out of a former 3-4 storey office block located in the very busy commercial and industrial heart of Acton, West London.

DSCF5591

Kingswood House, Sidcup

Dorton were appointed by our client McCarthy & Stone Retirement Lifestyles Limited as the preferred contractor

P9050027

Eastbourne college

In July 2015 Dorton commenced the £349 K asbestos removal and demolition project at Eastbourne College, Eastbourne working under the instructions of the college’s agent Millerbourne Architects.

DSCF8242

St Pauls School - Phase 2 Works

In June of 2015 Dorton Group returned to the prestigious St Pauls School to carry out the preliminary works of the phase 2 renewals program started in 2013.

figure1

St Levans Road Gas Holder, Plymouth

Working for our client and site owner, Wales and West Utilities plc, the Dorton Group were contracted to supply and fill with clean inert soil for the backfill of the former gas holder tank at St Levans Road, Plymouth.

stpauls main

St Pauls School, Lonsdale Road, London, SW13 9JT

Starting mid April 2013 for the 10 week asbestos removal program, followed by a further 4 weeks demolition, contaminated soil removal and reduced dig.

LINKED IN

Join our network

Click here

Thank you so much for 'brokering' an appointment for me with your Site Manager. I attached a picture taken from my flat across the street, which rather display why I am so captivated by the operation. Steve was very courteous & patient with his explanations. Your Team on site are great ambassadors for your business. The eventual rebuild will be far less interesting. With every good wish.